This procedure allows you to update the Manual EAC amount manually for the projects with a Manual EAC forecasting method.

When the Manual EAC forecasting method is selected, the background color of the Manual EAC column turns green.

  1. Navigate to Forecasts > Multi Project Forecast.

  2. Type in the Manual EAC for the projects with Manual EAC forecast method.

  3. Click the Save icon.