This procedure allows you to establish the time-phased settings manually in the Original Budget Time-Phasing panel.
-
Click the Time-Phasing tab.
-
Click the Time-Phasing Method ellipsis to select the required time-phasing method. The available time-phasing curves are listed below:
-
Back Loaded
-
Bell Curve
-
Detail Settings
-
Front Loaded
-
Linear
-
Manual
-
Project Schedule
-
-
Select the required Start Date and End Date.
-
Click the Save icon.