This procedure allows you to update the project material rates.
-
Click the Rate Tables tab.
-
In the Rates panel, click Update Project Material Rates.
-
Click the Insert Row icon to add a new labor rate.
-
Click the Material ID ellipsis to select the required material.
-
Click the Currency ellipsis to select the currency.
-
Click the Transaction Category: Region ellipsis to select the required region.
-
Type in the required Rate: Base.
-
Click SAVE. The Material Name auto-populates based on the Material ID selected.
Click the Delete Row(s) icon to delete the material rate.