This project default limits the node level for the BOM issue at the specified level or lower.
It is effective on Warehouse Management > Material Issuing page only.
-
Module(s) affected by this setting: Maintain BOM and MIR by BOM Commodity.
-
List of Values: 1 (default) - 10.
For example, when the BOM node hierarchy is GALAXY / WORLD / CONTINENT / EUROPE.
-
If set to 4, nodes in the EUROPE level can be selected in the Maintain BOM page BOM LOV.
-
If set to 3, nodes in CONTINENT or EUROPE level can be selected in the Maintain BOM page BOM LOV.
-