This project default allows you to change the behavior of the Reference Date field on the Load Fab Tracking page.
-
Module(s) affected by this setting: Site > Fab Tracking > Load Fab Tracking.
-
List of Values: Y and N (default).
-
If set to Y, Reference Date field is mandatory, and you must enter a value to save the job.
-
If set to N, Reference Date is optional.
-