This procedure allows you to update the project equipment rates.
-
Click the Rates Tables tab.
-
In the Rates panel, click the Update Project Equipment Rates.
-
Click the Insert Row icon to add a new labor rate.
-
Click the Equipment ID ellipsis to select the required equipment.
-
Click the Currency ellipsis to select the required currency.
-
Click the Transaction Category: Region ellipsis to select the required region.
-
Type the required Rate: Base.
-
Click the Save button. The Equipment Name auto-populates based on the Equipment ID selected.
Click the Delete Row(s) icon to delete the equipment rate.