Site Welds are Not Assigned to Spools - Isogen - Reference

Isogen Isometric Drawing Options Reference

Language
English
Product
Isogen
Search by Category
Reference
Smart 3D Version
11 (2016)
Isogen Control Panel Version
2.0(2016)
Isogen Version
13.0(2016)

Controls site weld assignment to adjoining spools. By default, site welds are assigned to spools if they are adjoining.

Select the check box to suppress the assignment of site welds to adjoining spools. To assign site welds to adjoining spools, clear the check box.

Defines:

Option Switch - 83, Pos 1
I-Configure - Drawing.Format.SiteWeldsNotAssignedToSpools