The P6 Dates import updates P6 Activity Dates summarized to the Project and WBS hierarchy.

  • Connect Job: P6 Dates Import

  • EcoSys Action: ITG P6 Dates Import

  • Dependencies: P6 Project and WBS Import

The EcoSys Cost Object External Key field is used to update from the P6 WBS Object ID.

Project level mapping follows the logic described in the section Map an existing EcoSys Project to a P6 Project.

Field Mappings

The default behavior of the Dates integration is to import the minimum and maximum of the P6 Dates at each level of the Project and WBS hierarchy which are listed in the field mapping table below. These dates can be changed by editing the Connect Job.

EcoSys Field

EcoSys Subject Area

P6 Field

External Key

Cost Object

WBS Object Id

Actual Start Date

Cost Object

Actual Start Date (min)

Actual End Date

Cost Object

Actual Finish Date (max)

Baseline Start Date

Cost Object

Baseline Start Date (min)

Baseline End Date

Cost Object

Baseline Finish Date (max)

Scheduled Start Date

Cost Object

Planned Start Date (min)

Scheduled End Date

Cost Object

Planned Finish Date (max)

Remaining Start Date

Cost Object

Remaining Early Start Date (min)

Remaining End Date

Cost Object

Remaining Early Finish Date (max)