View BOM Information - Intergraph Smart Materials - Version 2020 (10.0) - Help - Hexagon PPM

Intergraph Smart Materials Classic Help (2020)

Language
English
Product
Intergraph Smart Materials
Subproduct
Classic
Search by Category
Help
Smart Materials/Smart Reference Data Version
2020 (10.0)

The C.40.02 View BOM Information screen can be used by site users to get information about the BOMs of different projects.

In the first (Projects) block, you can query or browse through all projects you can access.

The list nodes are not populated automatically. To display the list nodes of the selected project in the second (List Nodes) block, either click the Query Details button or move the cursor to the second block and click the Exe Query button. The list nodes appear with the entire BOM path, the issue status derived from the related list positions, and the issue progress. The meaning of the issue progress is as follows:

  • None - Nothing has been issued from the list positions material of the selected list node.

  • Partly - The material of the selected list node has been issued partly.

  • Completely - The material of the selected list node has been issued completely.

  • No positions - The selected list node does not have any list positions assigned.

Keep in mind that only the list positions that fit the issue status logic specified in the project BOM options are considered.

In addition, the Total List Weight, Total Issue Weight, and % Issue Weight values appear.

In the third (List Node Values) block, the node attributes of the selected list node with their values are displayed.

Double-click in the BOM Path, List Node, or Issue Status field to open Window 2, which displays the list positions of the selected list node.

The first (List Positions) block shows the list positions with quantity, issued quantity, and reserved quantity. The progress appears in the Issue Progress field as:

  • None (Issue Qty = 0)

  • Partly (0 < Issue Qty < Quantity)

  • Completely (Issue Qty = Quantity)

In the second (List Position Values) block at the left bottom, the attributes assigned to the selected list position appear with their values.

In the third (related MIRs to List Position) block at the right bottom, the MIRs associated with the selected list positions are listed with creation date, posting date, and issue quantity.

To limit the displayed list nodes on Window 1 of C.40.02, you can define a setup set as a filter. Click the Setup button to open Window 3.

Select either the Best Quantity indicator in combination with the Use only Site Status indicator, or clear the Best Quantity indicator and select a fixed issue status from the LOV in the Issue Status field.

Select a list status from the LOV in the Min. List Status field. Only list positions with this list status or a higher list status assigned are considered.

By choosing one of your predefined work packages via LOV in the Work Package field, you can assign the associated work package nodes to your setup set. The nodes are shown in the Work Package Details block below. There you can delete or add nodes manually. Click the Nodes button to open the BOM multi selection LOV. Select the Sel check box of all nodes to be added, and then click the Fill In button to close the LOV and to insert the selected nodes.

After defining the setup, click the Return button to close the window. The Setup Set assigned indicator in Window 1 shows if a setup is defined.