Split Criteria - Intergraph Smart Materials - Version 2020 (10.0) - Help - Hexagon PPM

Intergraph Smart Materials Classic Help (2020)

Language
English
Product
Intergraph Smart Materials
Subproduct
Classic
Search by Category
Help
Smart Materials/Smart Reference Data Version
2020 (10.0)

With the split criteria, you can define if material that was collected by the MTO job should be split and distributed on multiple requisitions based on defined properties.

  1. Open the R.10.42 Req Split Criteria screen.

  2. Type the name of the split set in the Set Name box.

  3. Type the split set description in the Short Desc and Description boxes.

  4. Click Save.

  5. In the second (Req Set Details) block, type the name of the detail in the Detail Code box.

  6. Type a number in the Seq box.

  7. Select a where condition from the select list in the Where Condition box.

  8. Click Save.