Shipment Options - Intergraph Smart Materials - Version 2020 (10.0) - Help - Hexagon PPM

Intergraph Smart Materials Classic Help (2020)

Language
English
Product
Intergraph Smart Materials
Subproduct
Classic
Search by Category
Help
Smart Materials/Smart Reference Data Version
2020 (10.0)

The FR/RR searches for item shipments for which the predicted on site date (Pred on Site) is after the date defined in the Start Date field and earlier than the date defined in the End Date field. See also the description of the Allocate Level option in the section above.

Select the Not handle null dates indicator when item shipments with an empty Pred on Site date field should be ignored.