Create an engineering requisition from plan data - Intergraph Smart Materials - Version 2020 (10.0) - Help - Hexagon PPM

Intergraph Smart Materials Classic Help (2020)

Language
English
Product
Intergraph Smart Materials
Subproduct
Classic
Search by Category
Help
Smart Materials/Smart Reference Data Version
2020 (10.0)
  1. In the menu tree, navigate to Smart Materials > E&PI(Req) > R.30 Requisitions, and double-click R.30.01 Maintain Requisitions.

  2. Make sure the project default ZP_MS_PLAN is set.

    SHARED Tip Click Valid settings ValidSettings on the toolbar, and scroll down to see ZP_MS_PLAN.

  3. Cancel the query.

  4. On the pop-up window for P.60.03 Requisitions Planning, select a requisition.

    The software copies values from P.60.03 Requisitions Planning.

    SHARED Tip If ZP_MS_PLAN is not set, you can still get the plan data from P.60.03 if you place your cursor in the Engineering Requisition field and click List of values LOV_Classic.