Open an IWP - Intergraph Smart Construction - 4.0 - Help - Hexagon

Intergraph Smart Construction OnSite Help

Language
English
Product
Intergraph Smart Construction
Search by Category
Help
  • Select an IWP from the list to view it.

  • An IWP is automatically removed from OnSite if it is deleted from the Smart Construction client.

  • The IWP is removed from OnSite if the IWP was assigned to another user, or the planned dates are outside the date range set in the user preferences. The IWP is only removed from the device. It is still available in the Smart Construction client.

  • The unresolved blockage icon BlockageOnComp indicates a component in the IWP has a blockage. Open an IWP to view the blockage.

  • Select filter_black to filter the packages by date. Any IWP with an actual date assigned is always displayed.

  • Actual dates are appended with an A.