Ownership - Intergraph Smart P&ID - Configuration - Intergraph

Intergraph Smart P&ID Workshare Configuration and Reference (2019)

Language
English
Product
Intergraph Smart P&ID
Search by Category
Administration & Configuration
Smart Electrical Version
2019 (9.0)
Smart P&ID Version
9 (2019)
Smart Engineering Manager Version
10 (2019)

During the course of administering a connected Workshare collaboration, you can decide to transfer the ownership of a plant group item, such as a unit, to a satellite site. Transferring ownership at this level allows the connected satellite site full control over plant group properties modifications. The owner can also delete the plant group item if all the drawings under it have been deleted.