Back Up Each Upgraded Plant - Intergraph Smart P&ID - Installation & Upgrade - Intergraph

SmartPlant P&ID Installation and Upgrade Guide

Language
English
Product
Intergraph Smart P&ID
Search by Category
Installation & Upgrade
SmartPlant Foundation / SDx Version
Smart Electrical Version
2015 R1 (7.1)
Smart Instrumentation Version
(none)
Smart P&ID Version
7.1 (2014 R1)
Smart Engineering Manager Version
7.2 (2014 R2)
Smart P&ID Web API Version
(none)

After you have completed the upgrade process for each plant, you should do the following:

  1. Set the backup location for the plant in Smart Engineering Manager and perform a full backup. For more information about backing up a plant, see Backing Up and Restoring Your Data (see ) in Smart Engineering Manager Help.

  2. Perform a complete database backup.

  3. Perform a file system backup to archive the drawings, reference data, and other files.