Multiple project defaults are available for the E&PI(BOM) module that can be set on the Administration > Project Defaults screen at the project level or at the project discipline level. A complete list of all the project defaults with a detailed description, usage, and how to define the values can be found in the Project Defaults.

How to set the project defaults depend on the corporate procedures and on project requirements.

These are the recommended settings regarding the BOM setup:

  • ZB_1MSTR (Only one master node?) = Y

  • ZB_BOMHIER (Free BOM structure?) = N.

With these settings, you enforce a fixed WBS (Work Breakdown Structure). A more detailed explanation is provided in the Bill of Material Setup.