Import Alternate Structure Details - EcoSys - 2.03 - Administration & Configuration - Hexagon PPM

EcoSys Help - Core and Projects Administration (2.03)

Language
English
Product
EcoSys
Search by Category
Administration & Configuration
EcoSys Standard Version
2.03

This procedure allows you to import alternate structures. Alternate structures details can be imported.

  1. Navigate to Admin > Projects Admin > Maintain Alternate Structures.

  2. At the top of the screen, in the green parameter bar, click the Alternate Structure ellipsis to select the required alternate structure type.

  3. Click the Refresh button.

  4. Click the Import tab.

  5. Navigate to Sheet > Import.

  6. Click Choose File to select the required file.

  7. Select the required Format as per the selected file. The available values are listed below:

    • Excel

    • Tab-delimited

  8. From Import Rule for Incoming Records, select the Create New / Update Existing option.

  9. Select the Preview data before saving check box to validate the data before importing.

  10. Click OK to import the file.

    Verify the data on the screen, if there are any missing or blank fields, click the Refresh button to discard the data and repeat the above procedure to import the file again.

  11. Click the Save icon.