Check Reservations - Intergraph Smart Materials - Version 2020 (10.0) - Training - Hexagon

Intergraph Smart Materials Classic Lab Tutorials (2020)

Language
English
Product
Intergraph Smart Materials
Subproduct
Classic
Search by Category
Training
Smart Materials/Smart Reference Data Version
2020 (10.0)

Purpose

This section explains how to check which material is reserved.

Exercise

  1. Open the C.30.21 Forecast/Reservation Overview screen from the Smart Materials > Site > Field Material Control > C.30 Construction Planning menu branch.

  2. Click the Exe Query button to view the FR-TRAIN01 forecast and reservation run.

  3. Click Show Results.

    The C.30.02 Reserved Nodes screen opens and displays the BOM nodes assigned to the selected run.

    SHARED Tip You can open C.30.03 Reserved Positions from the Fastcall menu as described in the previous exercise.

  4. Close the screen.

  5. Open the B.20.03 Adv. Maintain BOM screen from the Smart Materials > E&PI(BOM) > B.20 Maintain BOM menu branch.

  6. Select the top node.

  7. Open the shortcut menu with a right mouse-click.

  8. Select Expand All from the menu.

  9. Double-click an end node, for example, PIPING/A100/NF12004/01.

    The Multi Position View displays the positions of the selected node.

  10. Select the Single Bulk Material View tab.

    The quantity reserved by the reservation run is shown in the Resv Qty field.

  11. Close the screen.