Reallocate Issues - Intergraph Smart Materials - Version 2020 (10.0) - Training - Hexagon

Intergraph Smart Materials Classic Lab Tutorials (2020)

Language
English
Product
Intergraph Smart Materials
Subproduct
Classic
Search by Category
Training
Smart Materials/Smart Reference Data Version
2020 (10.0)

Issued or reserved material can be transferred from a BOM node/position to another BOM node/position. Only issues by reservation (C.20.21) or issues by BOM (C.20.22/C.20.22.02) are available for reallocation. To reallocate issued or reserved material, use the C.20.28 Reallocate Issues screen.

To create a new material reallocate issue report, click the New Record button, select the creation date from the LOV in the MRI Create Date field, select the company from the LOV in the Company field, and save the record. The MRI number is automatically created according to the rule defined on C.10.17 and assigned to the user on C.10.21.

Next, click in the left List Node field in the second (Reallocate Issues) block and open the LOV using the LOV button. Select the target list node from the LOV and click OK to close the LOV and copy the node to C.20.28. The BOM Path field is automatically populated. Then enter the position or select it from the LOV in the Pos field. The list pos qty, the reserved qty, and the issued qty of the selected position appear; in addition, the unit, the tag number, and the ident details appear.

The Max. Reallocate Reserved/Issued Qty fields show the maximum quantity of the selected ident that can be reallocated to another BOM position.

Click now in the List Node field on the right side and select the destination list node from the LOV. Then enter the position or select it from the LOV in the Pos field.

Finally, enter the quantity to be reallocated in the Reallocate Resv Qty or the Reallocate Issue Quantity fields. Then save the changes.

To distribute the Reallocate Resv Qty amount to various reservation runs or the Reallocate Issue Quantity amount to various MIRs, go to the next block to open a new window. If you do not distribute the quantity, the software distributes the quantity automatically when the MIR is posted.

To complete the material reallocation, click the Post button in the first block.

Prerequisites for material reallocation are:

  • The same material (ident) must exist on both selected list nodes.

  • The target list node must have a shortage of the ident.