Post the MRR - Intergraph Smart Materials - Version 2020 (10.0) - Training - Hexagon

Intergraph Smart Materials Classic Lab Tutorials (2020)

Language
English
Product
Intergraph Smart Materials
Subproduct
Classic
Search by Category
Training
Smart Materials/Smart Reference Data Version
2020 (10.0)

Purpose

This section explains how to post an MRR to enter line items in the inventory.

Exercise

  1. Open the C.20.01 Prepare MRR by PO screen from the Smart Materials > Site > Field Material Control > C.20 Warehouse Management > Receiving menu branch.

    The screen opens in query mode.

  2. Enter MRR-TRAIN-0001 in the MRR Number field or select it from the LOV.

  3. Click the Run Query button to display the selected MRR.

  4. Ensure that the Auto create OSDs check box is selected.

  5. Click the button.

    Position 2 is highlighted with a magenta background color in the Pos field, which indicates that an OSD was created for this position.

  6. Double-click in the Pos field to open the C.20.09.01 OSD for Receiving screen.

  7. Enter Short in the Short Desc field.

  8. Enter Short-shipped in the Description field.

  9. Enter Provide missing quantity ASAP! In the Required Action field.

  10. Save the changes using the Save button.

  11. Close the screen by selecting File > Close All or Close from the main menu.