ZB_SPLNODE - Intergraph Smart Materials - Version 2020 (10.0) - Administration & Configuration - Hexagon PPM

Intergraph Smart Materials Classic Administration (2020)

Language
English
Product
Intergraph Smart Materials
Subproduct
Classic
Search by Category
Administration & Configuration
Smart Materials/Smart Reference Data Version
2020 (10.0)

This project default specifies the node below which nodes are created for each master tag; detail tags will be inserted as positions of these nodes.

This project default is necessary if you want to split tags in procurement, expediting, traffic, or site by clicking the Split Tag button, which is found on screens P.50.07, P.70.72, and C.20.01.

The node type of the newly created nodes is copied from the node that you select for project default ZB_SPLNODE.

Only root nodes without any child nodes can be selected for this project default. After a node has been assigned to this project default, it is not displayed any longer in any BOM tree (with the exception of the C.30.02 Reserved Nodes screen). Once detail tags have been created, the value of this project default cannot be changed any longer.

  • Module(s) affected by this setting: C2001, C200102, C2004, C2005, P5001, P5007, P7031, P7062, P7072, P8011, P8051

  • Default value: ./.

  • List of Values: B2001 BOM Master Notes