ZB_EST_LEV - Intergraph Smart Materials - Version 2020 (10.0) - Administration & Configuration - Hexagon PPM

Intergraph Smart Materials Classic Administration (2020)

Language
English
Product
Intergraph Smart Materials
Subproduct
Classic
Search by Category
Administration & Configuration
Smart Materials/Smart Reference Data Version
2020 (10.0)

This project default specifies the level in the BOM hierarchy at which the estimation shortage is calculated and the Estimation Shortage node (indicated by ZB_EST_NOD) is created. This level usually represents the line level in the BOM hierarchy. All ISO nodes are found below this level.

  • Module(s) affected by this setting: B2003

  • Default value: ./.

  • List of Values: B1003/B1007 Node Type/Hierarchy