Change Gapping Priority - Intergraph Smart P&ID - Help - Intergraph

SmartPlant P&ID Options Manager Help

Language
English
Product
Intergraph Smart P&ID
Subproduct
Options Manager
Search by Category
Help
Smart P&ID Version
7.1 (2014 R1)
Smart Engineering Manager Version
7.2 (2014 R2)
  1. Select Gapping PPM All Outputs Graphic.

  2. Select the Line Type row with the priority you want to modify.

  3. Select Move Item Up PPM All Outputs Graphic or Move Item Down PPM All Outputs Graphic to move the selected row.

  • The higher a line type is in the Gapping list, the higher its priority.  When two lines intersect, the software makes a gap in the line type with the lower priority.

  • When changing the priority of gapping, you can move only one gap row at a time.