Displays the Schedule Task Wizard. Use this wizard to schedule the update operations for any out-of-date drawings. For information about using this wizard, refer to Schedule Task Wizard.
-
In order to use this command, you must be assigned the user right Update P&ID on the Role Properties dialog box in SmartPlant Engineering Manager. Also, you are required to have Full Control assigned on P&ID Objects.
-
Any changes made to the out-of-date drawing settings after the task is scheduled will not affect the scheduled task.
-
If update drawings processing is scheduled for a hierarchy item, select in the Tree view, at the scheduled time all the drawings under it are analyzed and only the out-of-date drawings are updated.
-
If update drawings processing is scheduled for drawings, selected in the List view, at the scheduled time only the selected drawings are analyzed and the out-of-date drawings are updated.
-
Drawings with missing symbols are logged but not updated. Drawings that do not require an update are logged with a message that the drawing is up-to-date.