Drawing Status Dialog Box - Intergraph Smart P&ID - Help - Intergraph

SmartPlant P&ID Drawing Manager Help

Language
English
Product
Intergraph Smart P&ID
Search by Category
Help
SmartPlant Foundation / SDx Version
Smart P&ID Version
7.1 (2014 R1)
Smart Engineering Manager Version
7.2 (2014 R2)
Smart P&ID Web API Version
(none)

Displays information about the project and user that changed the drawing status, the time the status was changed, and any comments that were added when the status was changed. Status changing operations include checking out, checking in, fetching a drawing, and undoing a checkout. This dialog box opens when you select drawings in the Tree view and then click Project > Drawing Status.

History — Displays the pertinent information about the selected drawings.