Revise an Existing, Previously Published Document - Integration - Update 44 - Help - Hexagon

SmartPlant Integration COM Help

Language
English
Product
Integration
Search by Category
Help
SmartPlant Foundation / SDx Version
10
Smart P&ID Version
9 (2019)
Smart Engineering Manager Version
10 (2019)

In a similar scenario for an Off-Site project, a tool revises an existing document that was previously revised and published in an integrated environment. The tool manages its own revision schemes and sets the revision of the document to D.

If the disconnected revision is compatible with the most recently used SmartPlant Foundation revision scheme, the Revise dialog box displays that revision scheme as the default. You can accept the default revision scheme or change it. SmartPlant Foundation also sets the initial available major revision as D. You can accept the default major revision or change it.

If the disconnected revision is incompatible with the most recently used SmartPlant Foundation revision scheme, you must set the revision scheme in the Revise dialog box.