Initialize from Oracle 10g/11g to Oracle 12c - Intergraph Smart Instrumentation - Installation & Upgrade - Hexagon PPM

SmartPlant Instrumentation Installation and Upgrade Guide

Language
English
Product
Intergraph Smart Instrumentation
Search by Category
Installation & Upgrade
Smart Instrumentation Version
2016 SP1 (11.0.1)

If you are upgrading your database from Oracle 10g or 11g to Oracle 12c then you must initialize the 10g/11g to Oracle 12c. For this you must have two Oracle database server platforms:

  • Oracle 10g/11g 64-bit, where the old (source) database schema is located.

  • Oracle 12c 64-bit, the new target database.

  1. After the SmartPlant Instrumentation 2016 upgrade make sure that both database versions match.

  2. Configure the Oracle Net Manager of 12c 64-bit server database and the intools.ini file.

  3. Connect to the Administration module, System Administration, and from the File menu click Initialize.

  4. In the Source Data Connection dialog box, from the Database type list, select one of the following:

    • Oracle 10g

    • Oracle (for 11g)

  5. Click OK.