Configuring an alternate Work Breakdown Structure (WBS) - SmartPlant Foundation - IM Update 46 - Help - Hexagon

SmartPlant Foundation Help

Language
English
Product
SmartPlant Foundation
Search by Category
Help
SmartPlant Foundation / SDx Version
10
SmartPlant Markup Plus Version
10.0 (2019)
Smart Review Version
2020 (15.0)

The Work Breakdown Structure (WBS) contains information about the concepts of the project in a plant, project, and contract structure.

The delivered core model provides the following structure:

Configuration Top

Plant

Project

Doc Configuration (for published documents)

An example of an alternative structure is:

Configuration Top

Site

Plant

Project

To configure an alternate WBS:

  1. In Schema Editor, create a new class definition.

  2. Realize the ISPFConfigurationItem interface, and set the Dependent Configuration property.

    For information about how to load this configuration into SmartPlant Foundation, see Loading the extended model.

In an integrated environment, the WBS must be configured as follows for SmartPlant Foundation to work:

Configuration Top

Plant

Project