Reallocate Issues - Intergraph Smart Materials - 10.2 - Training - Hexagon

Smart Materials Web Tutorials

Language
English
Product
Intergraph Smart Materials
Subproduct
Web
Search by Category
Training
Smart Materials/Smart Reference Data Version
10.2

Issued or reserved material can be transferred from a BOM node/position to another BOM node/position. Only issues by reservation or issues by BOM are available for reallocation. To reallocate issued or reserved material, use the Reallocate Issues screen.

To create a new material, reallocate issue report, click the Create MRI button. Select the creation date from the LOV in the MRI Create Date field, and then select the company from the LOV in the Company field. Save the record. The MRI number is automatically created according to the rule defined in Site Rules screen.

Click on the MRI number hyper link to open Reallocate Issue Details screen. In Reallocate Issue Details tab, click on the Add Row button. In List Node field, open the BOM List Node using the LOV button. Select the target list node from the BOM List Node and click Select. The BOM Path field is automatically populated. Then, click on LOV button in the position, it will open Reallocate Issues window, click the hyperlink in the List Position field to choose position. The list pos qty, the reserved qty, and the issued qty of the selected position appear; in addition, the unit, the tag number, and the ident details appear.

The Max. Reallocate Reserved/Issued Qty fields show the maximum quantity of the selected ident that can be reallocated to another BOM position.

Click now in the List Node field on the right side "To" header field and select the destination list node from the LOV. Then enter the position or select it from the LOV in the Position field.

Finally, enter the quantity to be reallocated in the Reallocate Reserved Qty or the Reallocate Issue Quantity fields. Then, save the changes.

To distribute the Reallocate Reserved Quantity amount to various reservation runs or the Reallocate Issue Quantity amount to various MIRs, go to the next block to open a new window. If you do not distribute the quantity, the software distributes the quantity automatically when the MIR is posted.

To complete the material reallocation, navigate to Reallocate Issues tab, select the check box of the MRI, and click the Post button.

Prerequisites for material reallocation are:

  • The same material (ident) must exist on both selected list nodes

  • The target list node must have a shortage of the ident.