Quiz Answers - Intergraph Smart Materials - 10.1 - Training - Hexagon

Smart Materials Web Tutorials

Language
English
Product
Intergraph Smart Materials
Subproduct
Web
Search by Category
Training
Smart Materials/Smart Reference Data Version
10.1
  1. How would you set up a fixed BOM node hierarchy?

    Set the project default ZB_BOMHIER to N and define the BOM hierarchy on B.10.07.

  2. Where should the S/F (shop/field) information of a BOM position should be stored?

    b. Position Property

  3. You create a new BOM position using specification items. Which data must be entered?

    Spec code, short code, option code, sizes.

  4. How can a BOM node be locked?

    Using a verification job, set the list status that has the Lock indicator checked.

  5. Which BOM position information is an indicator for the status or quality of the position?

    List status.