Project Defaults - Intergraph Smart Materials - Version 2020 (10.0) - Training - Hexagon

Smart Materials Web Tutorials 2020 (10.0)

Language
English
Product
Intergraph Smart Materials
Subproduct
Web
Search by Category
Training
Smart Materials/Smart Reference Data Version
2020 (10.0)

Some of the project defaults must be set before you start using the Site module on a new project. Others are optional depending on the detailed workflow established by the project.

Project Default

Comment

ZC_BIN_LOC

This project default controls whether warehouse logic (Warehouses and Locations) is used (ZC_BIN_LOC=WHTU, default), or whether bin location logic is used (ZC_BIN_LOC=BLOC).

ZC_MULT_WH

If the project default ZC_MULT_WH is set to Y, you can only work with those warehouses for which the Use for Issues option has been checked on the Warehouses screen.

ZC_OI_HIST

Set this parameter to Y if you want to see the overissue history of an ident on the Inventory History screen. If this parameter is set to N, the overissue history is not shown.

ZC_QTYTRAN

This project default is used for material transfer. If the value is set to N (default), the move quantity is populated with 0 (zero) as the default in the corresponding screens. If ZC_QTYTRAN is set to Y, the move quantity is populated with either the reserved or the on hand quantity (depending on the kind of material transfer).