Some of the project defaults must be set before you start using the Site module on a new project. Others are optional depending on the detailed workflow established by the project.
Project Default |
Comment |
---|---|
ZC_BIN_LOC |
This project default controls whether warehouse logic (Warehouses and Locations) is used (ZC_BIN_LOC=WHTU, default), or whether bin location logic is used (ZC_BIN_LOC=BLOC). |
ZC_MULT_WH |
If the project default ZC_MULT_WH is set to Y, you can only work with those warehouses for which the Use for Issues option has been checked on the Warehouses screen. |
ZC_OI_HIST |
Set this parameter to Y if you want to see the overissue history of an ident on the Inventory History screen. If this parameter is set to N, the overissue history is not shown. |
ZC_QTYTRAN |
This project default is used for material transfer. If the value is set to N (default), the move quantity is populated with 0 (zero) as the default in the corresponding screens. If ZC_QTYTRAN is set to Y, the move quantity is populated with either the reserved or the on hand quantity (depending on the kind of material transfer). |