After you finish generating the load files, load all the modified load files to the SmartPlant Foundation Desktop Client. The SCHEMA_TAG_Integration.xml file needs to be validated first before loading it into the Desktop Client.
The following work process diagram explains the process of loading SPO/E Core load files:
What do you want to do?