WO cost summary-hospitality - HxGN EAM - Help - Hexagon

Report EAM

Language
English
Product
HxGN EAM
Search by Category
Help
HxGN EAM Version
11.7.1

Description

Includes itemized and total cost information (labor, materials, services, and tool costs) by equipment for open and closed work orders.

Menu Path

Equipment > Reports > WO Cost Summary-Hospitality

Parameters

Enter the Property, Type, Equipment, Profession, Reporting Currency, Current Exchange Rate, WO Status, and Include WOs.

Current Exchange Rate - Select to calculate the conversion based on the active exchange rate. Otherwise, the system calculates the conversion based on the exchange rate on the work order’s creation date. The system calculates the conversions on the printed report.

Show Child Equipment - Select to show work order costs for children of the selected Equipment. The system includes only the children for which costs roll up to the parent.

You can select Show Child Equipment only if Equipment is entered.

Show Details - Select to display the work order details in addition to the work order cost information.

Group By - Select to group by Equipment or Profession.

Start Date and End Date - Enter the starting and ending date for which to retrieve data.

Report Type

Basic