Material List - Pipeline/Drawing (OS 24) - Isogen - Reference

Isogen Option Switches Reference

Language
English
Product
Isogen
Search by Category
Reference
Isogen Version
13.0(2016)

Option Switch 24 Position 1

Controls whether material lists are produced by the following:

  • OS 24 Pos 1 = 0 - Drawing

  • OS 24 Pos 1 = 1 - Drawing

  • OS 24 Pos 1 = 2 - Drawing (spool isometric material part numbers match full isometric material part numbers)

  • OS 24 Pos 1 = 3 - Pipeline (spool isometric material list numbers match full isometric material list numbers)

However, this is only relevant on split isometrics that have more than one drawing as illustrated by the following examples.

Example 1

  • OS 24 Pos 1 = 0 - Produces the material list by drawing

  • OS 24 Pos 1 = 3 - Produces the material list by drawing. Appears in this form on both full and spool isometrics; all part numbers match.

Example 2:

  • OS 24 Pos 1 = 1 - Produces material list by pipeline.

  • OS 24 Pos 1 = 3 - Produces the material list by pipeline, which appears in this form on both full and spool isometrics; all part numbers match.

Option Switch 24 Position 2

Controls the way pipe lengths are reported on the BOM. There are three styles each for metric and imperial length.

See Also

Option Switch 24: Material List (Pipeline/Drawing/Pipe Length Units)