Resurrection Instruction - Intergraph Smart P&ID - 10.0 - Administration & Configuration - Hexagon PPM

Intergraph SmartPlant Enterprise Adapter for Smart P&ID

Language
English
Product
Intergraph Smart P&ID
Search by Category
Administration & Configuration
SmartPlant Foundation / SDx Version
Smart Electrical Version
10
Smart P&ID Version
10
Smart Engineering Manager Version
11

SmartPlant Foundation generates a Resurrection instruction when:

  • Reverting Smart P&ID to a previous backup.

  • Fetching an Old Version of a Smart P&ID Drawing.

Example:

  1. Publish Dwg1 with Equipment P-100. (Ver 1)

  2. Backup Smart P&ID.

  3. Delete P-100.

  4. Publish Dwg1. (Ver 2). This will result in a delete instruction.

  5. Restore the backup in Smart P&ID.

  6. Publish Dwg1. (Ver 3) . This will result in a resurrection instruction to create P-100.