In this module, you can add, view, and update welding procedures for the selected welding process.

  1. Click Welding Procedure.

  2. Click Add Item .

  3. Enter the following information:

    • Procedure ID - Specifies a unique ID for the welding procedure.

    • Discipline - Specifies the discipline of the welding procedure. Select a discipline from the menu list.

    • Weld Process 1 - Specifies the welding procedure. Select a weld process from the menu list.

    • P" Number 1 - Specifies the P number. Select a P number from the menu list.

    • F" Number 1 - Specifies the F number. Select a F number from the menu list.

    • Number 1 Max Thickness - Specifies the maximum thickness for the weld.

    • Vertical Welding 1 (up, down, both) - Specifies the vertical welding.

    • Backing 1 (with/without) - Specifies the backing.

    • Backing Material 1 - Specifies the backing material.

    • Shielding Gas 1 - Specifies the shielding gas.

    • Shielding Gas Composition 1 - Specifies the shielding gas composition.

    • Insert Gas Backing 1 - Specifies the type of inert gas backing required.

    • Insert 1 (Yes/No) - Specifies whether inert gas backing is required.

    • Product Form 1 (solid/flux/metal cored) - Specifies the product form.

    • Joint Position 1 - Specifies the joint 1 position.

    • Current Polarity 1 for GTAW - Specifies the polarity for GTAW welding.

  4. Click Save.