Click SRD > XS20 Spec > XS2020 Spec Editor.
-
Select Material Schedule Dependencies from the list in the tree view.
-
Double-click a table in the tree view on the left. An example is the P_MATERIAL table.
-
In the middle view, select a table detail .
In the middle view tree, bold text means that one or more assignments have already been done.
-
In the right view, select boxes in the Assign column to assign the schedules to the material.
-
Type numbers in the Seq. column for the selected rows.
The sequence numbers order the Selection list entries in the Thickness grid in the Spec Editor (Cover page).
-
Click Save .