Constant Values (only in SSC) - Intergraph Smart Production - Help - Hexagon

Intergraph Smart Production Worktime Calculation

Language
English
Product
Intergraph Smart Production
Search by Category
Help

The constant workload times are updated for the named tasks. The workload times in the list are part-specific, quotation item/order item -specific, or quotation/order -specific, and all use the same material.

Time values for one part are:

Part Nesting Time

Cutting Part Marking

Part Packing Time

Part Measuring Time

Shear Cutting Time

Shear Cutting Part Marking

Shear Cutting Part Picking

Bending Measuring Time

Bending Pressing Time

Straightening Time

Subcontracting Time

Charge Number Transfer (Internal)

Charge Number Transfer (External)

Material Certificate

Time values for quotation/order item are:

Part Geometry Drawing

Part Geometry Checking

Cutting Reading Instructions

Shear Cutting Reading Instructions

Shear Cutting Machine Setup Time

Shear Cutting Cleaning Scrap

Bending Reading Instructions

Straightening Setup Time

Beveling Setup Time

Manual Bevel Base Time

Mechanical Bevel Base Time

Blasting Base Time

Time values for quotation/order items using the same material are:

Nozzle Setup Time, Plasma

Nozzle Setup Time, Flame

Nozzle Setup Time, Laser

Nozzle Setup Time, Water

Shear Cutting Plate Lifting

Shear Cutting Cleaning Scrap