The Smart Production SSC system contains the following pre-configured work phases. Work phase load is calculated for one piece. Setup and some other times are divided to all pieces inside the order item. Time calculation is for one piece. Total time calculation is the work phase job count multiplied by one piece work time.

The following post fixes represent calculation values:

  • OR - Order

  • OI - Order Item

  • C - Constant Value

  • WG - Work Group Dependent Value

  • WP - Work Place Value

  • M - Material Dependent Value

  • BVL - Bevel Speed Parameters

  • PHC - Profile Head Codes

  • PP - Profile Parameters

  • PMF - Profile Material Factors