Work Time Calculation - Intergraph Smart Production - 20 - Help - Hexagon

Intergraph Smart Production System Settings

Language
English
Product
Intergraph Smart Production
Search by Category
Help

Work time calculation parameters affect the total work time of the cutting works directed to the work place. Times are given in different levels such as per nesting, per plate, or per part. Work time changes affect only the NC programs which are created after the changes have been saved.

NC Time Factor

The calculated NC time is multiplied by this factor.

Flow Time

The time in days that it takes for the work to be directed to the next work place.