Capacity - Intergraph Smart Production - 20 - Help - Hexagon

Intergraph Smart Production System Settings

Language
English
Product
Intergraph Smart Production
Search by Category
Help

The software calculates the capacity of a work place according to the selected calendar. Changes in the work place capacity can be done on the Capacity tab by changing shift codes for the selected dates. Shifts can also be added or deleted for a certain date. Only those shift codes which are defined in the specified calendar are available.

Capacity settings

Settings for the work place capacity can be done on the Settings tab below the Capacity list. By changing shift codes for the selected dates, you can add or delete shifts for a certain date. Only those shift codes that are defined in the specified calendar are available.

Calendar

Specifies which calendar is used to calculate the capacity of this work place.

Show in Work Plan

Specifies which work places are available for Work Plan. For an example the work places Laser, Material Reporting, Office and Packing are typed to be selected on Work Plan. See the list on right.

Capacity Check

Specifies is the capacity checked or not, and can the capacity be overloaded.

  • Not Checked

  • Checked – Overload allowed

  • Checked – Overload not allowed

Capacity Calculation

Specifies how the capacity is calculated.

  • By the defined shift calendar

  • By the capacity, if there is/are available user(s)

  • By the shift user count

Work Time Exceptions

Exceptions to the selected work place calendar are defined in the tab Work Time Exceptions. It is possible to define some period to use some other calendar (Exception Calendars) or more specific (days / shifts / hours) exceptions. Selected exceptions can be seen in the main capacity list in the display.