If job generation is selected, the parts to be nested are grouped based on their material and machine technology. Click Job to select the jobs to be carried out.

When the nesting is done, click Save.

When all the jobs are nested and saved, Smart Production Cutting closes. After this, Smart Production Sales asks whether the nesting percent, which was calculated to the positions based on the sales nestings, should be updated. If one position is nested to several sales nestings, its nesting percent will be the stressed nesting percent of the sales nestings.

For example, sales nesting 1, nesting-% = 80 %, Count = 10. Sales nesting 2, nesting-% = 70 %, Count = 7. Nesting percent of the position = (10 pcs * 80 %) + (7 pcs * 70 %) / (10 pcs + 7 pcs) = 75. 88 %.

If the answer to the question is yes, the work phases of the nested positions are recalculated. In this case, the price of the positions changes. Normally, sales nesting influences the material usage and cutting time.