Plate Part-Specific Work Phases or Geometry Default-Work Phases - Intergraph Smart Production - Help

Intergraph Smart Production Sales

Language
English
Product
Intergraph Smart Production
Subproduct
Sales
Search by Category
Help

This tab is used only with plate part drawings. Part-specific work phases are used in repeated quotations. Work phases of a position can be saved to the drawing data, from where they can be easily copied as work phases of a position.

If the drawing of an active position has plate part-specific work phases, they display on the left list. Click Set as default for geometry to copy the work phases of a position to the drawing. In this case, the work phases display on the left list.

Production information can be saved for individual work phases by selecting a work phase from the left list and typing the information into the box above the list. Click Save production info to save the information. When the work chain is updated, the information is copied to the work phase of the position.

Order of the work phases can be changed with the arrow buttons. The changes in the order are only valid in this situation and have no influence elsewhere.

Click Delete default work chain to delete a plate part-specific work phase.

Click Update work chain >> to save the work phases of a part to the active position.