Enable Workshare Dialog Box - Intergraph Smart P&ID - 10.0 - Administration & Configuration - Intergraph

Intergraph Smart P&ID Workshare Configuration and Reference

Language
English
Product
Intergraph Smart P&ID
Search by Category
Administration & Configuration
Smart P&ID Version
10
Smart Engineering Manager Version
11

Allows you to activate Workshare for the plant structure.

Workshare name — Type a name for the plant being enabled for Workshare. This name will be seen by the satellite site/location.

Publishing method — Select the publishing method to be used to share data contained in the plant.

  • Database — (Recommended) Published files are stored in the database as Oracle blobs at the host.  Oracle database links are used to transfer published files between host and satellites.

  • File share — Published files are stored on a file share at either the host or satellite site.

Publish location — Type a UNC path to the shared location on the host site where the published drawings are to be stored. The default location is the WsPublish folder in the plant folder. This field is limited to 255 characters.

  • Names cannot contain any of the following characters: ~ ` ! % ^ & * ( ) - + = { } [ ] \ / ; : ‘ " < > , . ? |

  • Location paths cannot contain any of the following characters: ~ ` ! % * ( ) { } [ ] / ; : ' " < > , ? |

  • For standalone Workshare mode, the File share publishing method must be selected.

See Also

Breaking the Database Link: The Significance
Enable Workshare