  1. Set the active plant as desired via Drawing Manager.

  2. On the Start menu, select Intergraph Smart P&ID Support Utilities > Global Report Utility to start the utility.

    The following form should be displayed:

  3. Expand the Plant tree in the Plant hierarchy pane to display the units. Once a unit has been selected the unit’s drawing list appears in the Drawing pane. If the Include Subnodes in ListView check box is selected, all drawings located underneath that plant group will be listed in the Drawing pane when that plant group is clicked.

  4. Highlight all drawings that are to be processed and select the add (>) button. This adds the drawings to the Drawing list pane.

    Drawings from multiple plant groups may be added to the Drawing list pane by highlighting the plant group at a level in the hierarchy that includes other desired plant groups in the Plant hierarchy pane and selecting the add (>) button.

    • All drawings from a plant item group (unit, area) or plant may be added to the Drawing list pane by highlighting the item in the Plant hierarchy pane and selecting the add (>) button or use (>>) button

    • Drawings can be removed from the drawing list by highlighting them in the Drawing list pane and selecting the remove (<) button.

    • Once the Drawing list pane contains all drawings that require processing, select the reports to be generated from the Project Report & My Reports list.

  5. Select the Include drawing stockpile check box if you want to generate a report including items in the drawing stockpile. Select the Individual Report per Drawing check box if you want to generate individual reports for each drawing. You may also select the Include plant stockpile check box if you want to include plant stockpile items in your report. However, if you include the plant stockpile, the option to generate an individual report per drawing is no longer available.

  6. Click OK to begin report generation.

    The utility will confirm the reports to be generated by displaying a report name list in the Selected Reports form.

  7. Click OK to continue. Clicking Cancel will dismiss the Selected Reports dialog box.

    The utility will generate the reports selected from the list. When the report generation is complete the following message will be displayed:

  8. Click OK and then click Exit to dismiss the utility form.

  • The default location of the reports generated by this utility is the "C:\Users\{username}\My Reports\Output" folder.

  • The naming convention used for the reports generated by this utility is {Drawing Name}-{Report Name}.xls.