Instructions - Intergraph Smart P&ID - 11 - Help

Intergraph Smart P&ID Support Utilities

Language
English
Product
Intergraph Smart P&ID
Search by Category
Help
Smart P&ID Version
11
  1. Set the active plant.

  2. On the Start menu, select Intergraph Smart P&ID Support Utilities > Global Validation Utility to start the utility.

    The following form should be displayed. User can select one or many drawings. Drawings in the Drawing list pane will be processed for global validation. For information on drawing selection control in this form, refer to Global Report Utility.

    GlobalValidationUtility Image 1

  3. Once the Drawing list pane contains all drawings that require processing, select the check boxes for the Item Types that you want to update in the Item Types section of the form. Also select the Item Tag Validation check box in the Validation Programs section of the form to allow item tag validation of the selected item types to be re-validated.

    GlobalValidationUtility Image 2

  4. Select the PipeSpec Validation check box in the Validation Programs section of the form to allow Piping Specification validation to be re-validated.

    GlobalValidationUtility Image 3

  5. Select the InsulationSpec Validation check box in the Validation Programs section of the form to allow Insulation Specification validation to be re-validated.

    GlobalValidationUtility Image 4

  6. Click the Enable button beside Change to PlantGroup if you want to change the plant group association for items on the selected drawing(s), and then select the new plant group for association from the list.

    GlobalValidationUtility Image 5

    Validation Programs and Item Types can be selected in any combination for processing.

  7. Select the desired options in the Options section. You can use the Include drawing stockpile and Include plant stockpile options in any combination to process the items as required.

  8. Click OK to begin re-validating the item tags, pipe specs, insulation specs and/or PlantGroup association.

    The frame at the bottom of the Smart P&ID Global Validation Utility form is used to display the update status.

    When the processing is done, the following message will be displayed:

  9. Click OK and then click Close to dismiss the utility form.