This status appears for Create tasks when the software has performed a validation and determines that an item with the same tag sequence number already exists. In such cases, the new item automatically receives a new sequence number, and the To Do List item status becomes Completed with Warning, indicated by the icon . The following scenario shows how a Create task can receive this status.
-
In Smart Instrumentation, create a loop named 'c-114' and publish the Instrument Index.
-
Retrieve the Index in Smart P&ID.
-
Open the To Do List to verify that a Create task exists for the loop, but do not run the task.
-
Close the To Do List and then manually create a loop named c-114.
-
Reopen the To Do List and execute the loop create task.
The software will create the loop, but actually renames it. In the To Do List, the Create task for the loop appears with a Completed with Warning status icon as shown.
-
Double-click the Create task to open the Properties dialog for the task and select the General tab.
An indication of the warning appears in the Notes field, together with details of the loop renaming.