Move a Partner Connector to Another Stockpile - Intergraph Smart P&ID - Help - Intergraph

Intergraph Smart P&ID Help

Language
English
Product
Intergraph Smart P&ID
Search by Category
Help
Smart P&ID Version
9 (2019)
Smart Engineering Manager Version
10 (2019)
SmartSketch Version
10.0(2018)
  1. In the Drawing view, right-click the connector whose partner you want to move.

  2. From the shortcut menu, select Move Partner OPC. If you select a connector that you do not have write privileges for, then the Move Partner OPC command is not available. That is, if the partner connector belongs to another drawing, you cannot move it, for instance. However, you can use Open Continuation Drawing on the shortcut menu to open the other drawing and move the connector from its stockpile. See Open a Continuation Drawing.

  3. On the Move Partner OPC Dialog, select the plant hierarchy element that contains the drawing whose stockpile you want to assign the connector to. If you do not want to place the connector in a stockpile of a specific drawing, you can select Stockpile at the bottom of the Plant hierarchy tree.

  4. In the Drawing list area, select the drawing whose stockpile you want to add the partner to.

If the partner connector is in a stockpile and is displayed in the Engineering Data Editor, you can move it from there. See Move a Connector to Another Stockpile.