Using Workshare in an Integrated Environment - Intergraph Smart P&ID - Help - Intergraph

Intergraph Smart P&ID Help

Language
English
Product
Intergraph Smart P&ID
Search by Category
Help
Smart P&ID Version
9 (2019)
Smart Engineering Manager Version
10 (2019)
SmartSketch Version
10.0(2018)

The following rules apply to using the Workshare functionality in an integrated environment:

  • You can enable and disable Workshare before or after registering a Greenfield plant.

  • You can create satellites and connect to them after registering.

  • You cannot register a satellite or a project host.

  • You cannot retrieve a PBS document when Workshare is enabled.

  • Satellites must transfer drawing ownership back to the host in order for the host to publish the drawings and in order for retrieved documents to have tasks updated within the satellite drawings.

Using the Smart P&ID SmartPlant Menu Commands Within a Workshare Collaboration

The Workshare host can perform actions using the following commands from within Smart P&ID when registered in an integrated environment:

Publish

Any drawing can be published.

Retrieve

Any document can be retrieved.

Correlate

Available to review correlations only if the drawing is read-only with respect to Workshare. No other correlation activity is allowed for read-only drawings. If the drawing is owned with respect to the Workshare site, then all correlation activities are available.

To Do List

Only available at the Workshare Host for drawings opened with read-write privileges. For drawings opened in read-only mode, commands that modify a drawing, such as the Run To Do List task, are not available. To Do List tasks can be reviewed on drawings for which the host does not have ownership, but these tasks cannot be executed unless ownership is assigned to the Host. The To Do List is not available at the Satellite.