The following table shows information about the symbols for break labels. When you drag these symbols to a drawing they are connected below the leader line attaching them to the item to which they are related. The Above sub-folder contains the identical set of symbols except that when you drag those symbols to a pipe run in a drawing they are connected above the leader line.
AABBCC CODE |
ICON |
SYMBOL FILE NAME |
LABEL TYPE |
PLACEMENT TYPE |
---|---|---|---|---|
6T6T01 |
Alternate Design P-T Temp.sym |
Break |
Two Point |
|
6H5C01 |
Alternate Oper P-T Break.sym |
Break |
Two Point |
|
6H6Y01 |
Cleaning Requirements.sym |
Break |
Two Point |
|
6H6U01 |
Coating Requirements.sym |
Break |
Two Point |
|
6H6Z01 |
Construction Responsibility.sym |
Break |
Two Point |
|
6H6G01 |
Construction Status.sym |
Break |
Two Point |
|
6H6P01 |
Design Responsibility .sym |
Break |
Two Point |
|
End of Group.sym |
Break |
Two Point |
||
6H6V01 |
Heat Tracing.sym |
Break |
Two Point |
|
Insulation Requirements.sym |
Break |
Two Point |
||
6H6J01 |
Materials of Const.sym |
Break |
Two Point |
|
6H5E01 |
Max Design Press - Temp.sym |
Break |
Two Point |
|
6H5A01 |
Max Operating Press - Temp.sym |
Break |
Two Point |
|
6H4C01 |
Nominal Diameter Break.sym |
Break |
Two Point |
|
6H6K01 |
Piping Materials Class.sym |
Break |
Two Point |
|
6H6A01 |
Safety Classification.sym |
Break |
Two Point |
|
6H6N01 |
Schedule or Thickness.sym |
Break |
Two Point |
|
6H4L01 |
Slope Break.sym |
Break |
Two Point |
|
6H4S01 |
Stream Number Break.sym |
Break |
Two Point |
|
6H6R01 |
Stress Analysis.sym |
Break |
Two Point |
|
6H6T01 |
Supply Responsibility.sym |
Break |
Two Point |
|
Test System.sym |
Break |
Two Point |